







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Mr-Glass Driveway & Pavers: The Enterprise Owner’s Guide
We install Mr-Glass-compatible driveway and paver systems in Enterprise, and most full paver driveway projects here run $7,000 – $18,000 installed, with repairs and small section replacements priced individually. Concrete driveways land at $4,500 – $12,000 and asphalt paving at $3,500 – $9,000. Mr-Glass is a proprietary paver and hardscape line, so the “part” that fails is usually a specific paver profile, an edge restraint, or a polymeric jointing element rather than a single mechanical component.

Enterprise owners typically discover a failure after the first hard monsoon season or a summer of 105°F-plus afternoons. You notice a settled section near the garage apron, sand washing out of the joints, or a paver that has heaved and now rocks underfoot. In the Nevada desert, the culprit is almost always the base, not the paver face. We’re an independent service provider, not affiliated with Mr-Glass, which means we can match your existing profile honestly and tell you when a repair beats a replacement.
Which Mr-Glass Models This Applies To

Mr-Glass hardscape profiles are identified by three things: the paver’s nominal dimensions (common module sizes run roughly 60mm and 80mm thick, with face dimensions that vary by series), the surface texture and color name, and the edge profile. The model name is rarely stamped on the paver itself. You identify your series by pulling one intact unit and measuring thickness with a caliper, then matching the color and texture against a sample set. That measurement matters more than the name, because a 60mm paver set into a base built for 80mm will not sit flush.
The compatibility gotcha: Mr-Glass color names are tied to specific production series, and two series can share a color name while differing in face dimension by a few millimeters. A near-match will show a visible seam line within one season in Enterprise’s sun. For the OEM-versus-aftermarket decision, we source the closest true match first and quote a quality aftermarket profile only when the OEM line is discontinued or priced past what the repair justifies. On a small patch, a matched aftermarket paver with the same thickness and a close texture often makes more sense than paying a premium for a discontinued color. On a full driveway, the material cost difference is small enough that we recommend staying with the original profile. We also handle KraftMaid, Cambria, and Silestone projects if your hardscape work is part of a larger remodel.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Mr-Glass Driveway & Pavers Is Failing
- Joint sand washing out after rain. Polymeric sand erodes when water channels under the pavers instead of running off. In Enterprise, a slope that drains toward the house rather than the street will lose joint sand within one monsoon cycle.
- A paver that rocks or sounds hollow underfoot. That’s a base failure, not a paver failure. The compacted aggregate beneath has settled or was never deep enough for the load, and the paver is now bridging a void.
- Heaving or tenting along the edge. Edge restraint failure lets the field spread outward. Once the border gives, the pavers behind it loosen in a widening band.
- Visible seam lines or a color patch that reads differently in sunlight. This is what a mismatched replacement paver looks like after a few months of UV exposure. The new unit cures to a slightly different tone than the weathered field.
- Standing water or a soft spot near the garage apron. Poor grading or a settled transition at the apron. Water pooling against the slab is the one symptom we treat as urgent, because it works its way under the garage floor.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Here’s how the numbers break down for Enterprise, installed, parts and labor together:
| Scope | Installed range |
|---|---|
| Paver driveway (full installation) | $7,000 – $18,000 |
| Concrete driveway | $4,500 – $12,000 |
| Asphalt paving | $3,500 – $9,000 |
| Full driveway replacement | $5,000 – $14,000 |
| Driveway sealing | $250 – $700 |
| Paver patio installation | $3,500 – $11,000 |
What moves you up or down the range: base depth and whether the existing base can be salvaged, the paver profile and whether it’s OEM or a matched aftermarket, total square footage, and how much edge restraint and drainage work the job needs. We deliver a written, line-item price before any work starts on every project, with parts and labor shown separately, so you can see exactly what the material costs against the installation. Every completed project carries our 365-Day Done Right Promise: if the work isn’t right within 365 days of the completion date, we make it right at no cost to you, and a free return visit covers any failure in that window.

DIY or Call Us?
You can safely handle the diagnosis. Pull one loose paver, measure its thickness, photograph the texture in daylight, and check whether the sand loss is surface-level or coming from a soft base underneath. That’s the information we need to quote accurately, and it costs you nothing.
Where it goes wrong: re-setting a paver without rebuilding the compacted base underneath simply moves the failure a few feet. Lifting an edge restraint to re-level a settled section on a driveway that’s already spreading will let the whole field walk again within a season. And if water is pooling against your garage slab, patching pavers over it traps moisture against the foundation. That’s the point to call a professional. Call (844) 797-6157 for a free estimate and we’ll tell you straight whether you’re looking at a spot repair or a base rebuild. A live person answers every call, day or night.
FAQs

A properly built paver driveway should hold 25 to 30 years in Enterprise’s climate, and the pavers themselves often outlast the base. Desert temperature swings from cold nights to 105°F afternoons stress the joint sand faster than mild climates, so plan on re-sanding every two to four years and sealing every three to five. The base, not the paver, is what determines whether you get the full lifespan. Call (844) 797-6157 for a free assessment.
Yes, often. A localized settlement or a failed edge restraint can be rebuilt section by section, and that’s usually the smarter spend if the rest of the field is stable and draining correctly. Full replacement makes sense when the base is compromised across the whole driveway or the profile is discontinued and patches show. We’ll give you both numbers in writing so you can decide. Call (844) 797-6157 for a free estimate.
A single-section repair or paver replacement typically takes a day, while a full paver driveway installation runs several days depending on square footage and base work. We schedule the work and confirm timing in the written price before anything starts, so you know what to expect. Call (844) 797-6157 to get your project on the schedule.
We measure your existing paver’s thickness and face dimensions and match the color and texture against current and legacy sample sets, quoting OEM first and a quality aftermarket equivalent as the fallback. We don’t claim to stock parts or carry them on a truck; we source the correct match for your specific profile. Every job comes with a background-checked technician whose name and photo you receive before the visit, per The Threshold Standard. Call (844) 797-6157 for a free estimate.
Written by the team at Mason Remodeling Enterprise, serving Enterprise and nearby areas.












