







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Ameristar Fence Installation: The Enterprise Owner’s Guide
Ameristar fence installation in Enterprise typically runs $3,500 – $9,000 for a standard residential run, and most projects are scheduled within a few days of the estimate. Ameristar makes welded steel and aluminum ornamental fencing – the kind you see around a lot of Enterprise HOA lots and pool enclosures – and the failure that brings most owners to this page is a leaning post, a rusted weld at a rail, or a gate that no longer latches because a hinge plate tore free. The fence usually looks fine at a glance. Then a wind gust in March bends a post cap back and the whole panel shifts.

We install Ameristar-compatible fencing across Enterprise. We’re an independent contractor and not affiliated with Ameristar – we source the product and put it in the ground the way the manufacturer specifies for Southern Nevada soil.
Key takeaways
- Standard Ameristar installation in Enterprise: $3,500 – $9,000.
- Most failures trace back to post footings, not the panels themselves.
- Powder coat and welds hold up in our heat; ground movement is what breaks fences here.
- Every job gets a written price before work starts and a 365-Day Done Right Promise.
Which Ameristar Models This Applies To

Ameristar makes several ornamental fence lines – Concord, Montage, and the aluminum residential series most common on Enterprise properties. They use different rail profiles and post sizes, and the hardware is not interchangeable between them. A 2-inch post cap for a Montage post won’t seat on a Concord post, and gate hinges for one series often have a different bolt spacing than another.
The fastest way to identify what you have is to measure the post. Ameristar ornamental posts generally run 2 inches, 2.5 inches, or 3 inches square depending on the series and whether it’s a line post, corner post, or end post. Check the inside of a post cap or the underside of a rail for a stamped model code. If the cap is welded shut, measure post width and rail height with a tape and photograph both before you call.
On the OEM-versus-aftermarket decision: for structural parts – posts, rails, hinges – we use Ameristar-spec or a verified equivalent, because the gauge and coating have to match or the part fails early. For caps and finials, a quality aftermarket piece is often fine and costs less. We’ll tell you which camp a part falls into rather than pushing OEM across the board.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Ameristar Fence Installation Is Failing
Most Ameristar problems show up as symptoms in the posts and hardware long before a panel actually comes down. These are the ones we see most in Enterprise:
- Posts leaning or tilting. Usually a footing that was set too shallow or in soil that wasn’t compacted. Enterprise’s caliche layer and the shrink-swell clay in older neighborhoods both push posts out of plumb over time.
- Rust at the weld joints. The powder coat can chip at a weld from flexing, and once bare steel is exposed, our dry heat doesn’t stop the corrosion – it just slows it. A brown streak at a rail-to-post joint is the first sign.
- Gate sagging or dragging. A hinge plate pulling loose from the post, or a post that’s tilted slightly out of plumb. Gates carry more load than panels and fail first.
- Loose or missing fasteners. Self-tapping screws back out of aluminum over years of thermal expansion. You’ll find them on the ground near the fence line after a hot summer.
- Panels racking out of square. When a post moves even an inch, the whole panel between it and the next post distorts. This is a footing problem, not a panel problem.
Replacement Cost & What’s Included

Ameristar-compatible fence installation in Enterprise runs $3,500 – $9,000. The range is driven by linear footage, fence height, number of gates, and – the big one – how much old fence and old footing has to come out before new posts go in.
- Removal and disposal of old fence: adds $400 – $900 depending on run length and whether old concrete footings need breaking out.
- New post footings: concrete-set posts at code depth. This is the part that determines whether the fence stands straight in ten years.
- Panels, rails, posts, and hardware: Ameristar-spec or verified equivalent material.
- Gate installation and adjustment: hung, latched, and swing-tested before we leave.
Every project gets a written, line-item price before a single tool is unpacked – no verbal estimates, no surprise invoices. The work is covered by the 365-Day Done Right Promise: if something we installed isn’t right within 365 days of the completion date, we come back and make it right at no cost.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
You can safely check a lot of this yourself. Walk the fence line and look for lean with a level. Photograph the model code inside a post cap. Tighten a loose gate hinge with a screwdriver. Pull a fence panel back into place to see if the post is what’s actually moving. That tells you whether you have a hardware problem or a footing problem.
Where DIY goes wrong is the footing. Setting a post in Enterprise soil without proper depth, drainage, and compaction is the reason most fences fail here in the first place. Digging out a failed footing is also more work than most homeowners expect once you hit that caliche layer. And any work involving a heavy panel or a full-height gate on your own is a two-person job with a real risk of a panel coming down on someone.
If you’re not sure what you’re looking at, call (844) 797-6157 – a live person answers every time, day or night, and we’ll help you sort out whether it’s a part you can swap or a post that needs replacing.
FAQs

Twenty to thirty years is realistic for the fence itself in Southern Nevada, because our dry climate doesn’t rust steel the way coastal areas do. The post footings are the weak point, not the panels – a fence with shallow footings can start leaning in seven to ten years even though the metal is fine. Call (844) 797-6157 for a free estimate on replacing or resetting post footings.
Often, yes. A single leaning post, a loose gate hinge, or one rusted rail can usually be repaired without replacing the whole run. If more than a few posts are out of plumb, repair stops penciling out and replacement makes more sense. We’ll tell you honestly which side of that line you’re on before you spend anything. Call (844) 797-6157 for a free estimate.
A standard residential run in Enterprise usually takes one to two days once the old fence is removed and footings have cured. Gate installation and adjustment add a few hours. We schedule around concrete cure time, so we’ll give you a realistic window in writing before work starts – not a vague “sometime this week.” Call (844) 797-6157 for a free estimate.
We source through Ameristar’s authorized distribution channel and verify the series and gauge against your existing fence before ordering – not just match the color. If a cheaper verified equivalent will do the job for a non-structural piece, we’ll say so. You get a written line-item price showing parts and labor separately, so you can see exactly what you’re paying for. Call (844) 797-6157 for a free estimate.
We also install KraftMaid, Cambria, and Silestone products for Enterprise homeowners on kitchen and bath projects – if you’re planning more than fence work, we can talk through both in one visit.
Get Your Ameristar Fence Priced in Enterprise
Whether you’re resetting a dozen posts or replacing the whole run, the next step is the same: a free estimate with a written price before any work starts. Every crew member is background-checked and identity-verified under The Threshold Standard, and you’ll get the technician’s name and photo before the visit plus a photo ID badge at the door. Call (844) 797-6157 to schedule your free estimate – a live person answers 24 hours a day, every day.
Written by the team at Mason Remodeling Enterprise, serving Enterprise and nearby areas.












