







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Ameristar Home Additions & ADU: The Enterprise Owner’s Guide
We build Ameristar home additions and ADUs in Enterprise, and a ground-up addition or a detached accessory dwelling unit typically runs $45,000 to $130,000 installed, depending on square footage, foundation type, and how much of the work is interior finish. Same-day is not realistic for new construction; we quote a start date and a completion window in writing before anything begins. Most Enterprise owners land on this page after a local inspector flags an Ameristar-designed addition plan, or after an older addition shows settling, moisture, or a finished-out ADU that never passed final inspection.

Which Ameristar Models This Applies To
Ameristar is a manufacturer of modular and pre-engineered home addition and ADU shells, not a single model line. The plan set that ships with the shell carries a series and model number on the title sheet, and the foundation detail is usually the deciding compatibility factor: some Ameristar shells are designed for a stem-wall perimeter foundation, others for slab-on-grade with a continuous footing. If you’re comparing an Ameristar addition against a site-built one, the shell arrives in engineered modules sized to an addition footprint already set by the plan, and an ADU map sheet gives you the module count, the electrical service requirements, and the plumbing rough-in locations. Measure your footing width and depth before anything else; we’ve seen shell sets spec’d for a 12-inch wall end up over a 10-inch footing, and that mismatch gets caught at inspection, not at the factory. For interior finishes we work with KraftMaid, Cambria, and Silestone alongside Ameristar shells, matched to the spec the plan calls for. We’re an independent builder and not affiliated with Ameristar; we build what the plan set specifies, sourced to spec.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Ameristar Home Additions & ADU Is Failing
With an addition or ADU, “failing” usually means a component the shell can’t fix on its own:
- A floor that’s out of level in one corner. Typically a foundation differential on the footing or a slab that’s settled unevenly. That’s a soil-moisture issue, and Enterprise’s shrink-swell soil and summer monsoon cycles are the usual cause.
- Moisture staining at the wall-to-floor joint. A failing moisture barrier or flashing detail where the addition ties into the original house. This is the most common cause of a failing final inspection on an Ameristar ADU.
- Doors and windows that stick every summer. Seasonal framing movement, made worse by the extreme desert heat-to-cool swing. Not dangerous, but a symptom worth watching.
- An ADU that never got its final sign-off. Often a missing electrical or plumbing rough-in inspection. Worth catching before you sell, because it surfaces at title.
- Roof-to-wall transition showing daylight or staining. A flashing and tie-in detail where the new roof meets the existing house.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
For Enterprise, an Ameristar home addition runs $45,000 to $130,000 installed, and an Ameristar ADU runs $90,000 to $220,000. What drives your number: square footage, whether the foundation is stem-wall or slab, electrical service upgrade needs, and how much interior finish is client-specified versus standard.
- Addition, installed: $45,000 – $130,000
- ADU construction, installed: $90,000 – $220,000
- Garage conversion (often the cheaper ADU path): $30,000 – $80,000
Every price is written before a tool comes off the truck, and it’s line-itemed to the shell, foundation, mechanical rough-in, and finish work. The 365-Day Done Right Promise covers the work for a year from completion; if a detail fails, we return at no charge.

DIY or Call Us?
You can safely verify your Ameristar plan sheet: confirm the series and model, measure your existing footing, and photograph the title sheet before anyone quotes. What you should not take on yourself is foundation work, electrical service, or gas rough-in. Those carry real risk of injury, code violation, and a failed final inspection, and an Ameristar shell spec’d to the wrong foundation is a structural problem, not a weekend fix.
If you’re at that decision point, call (844) 797-6157. We’ll walk you through the plan set and give you a written price on your Enterprise addition.
FAQs

How long does an Ameristar addition or ADU last in Enterprise? With proper flashing and a maintained foundation, an Ameristar shell is built to hold up for decades. In Enterprise’s heat and monsoon cycles, the failure points are the tie-in flashing and the footing drainage, so we inspect and detail both at build.
Can it be repaired instead of replaced? Often, yes. A settled footing can sometimes be stabilized, and a failing moisture barrier can be re-flashed without rebuilding the shell. We assess before recommending a full replacement.
How long does the build take? A garage conversion runs a few weeks; a full Ameristar ADU takes longer, and the exact window is written into your quote. Call (844) 797-6157 for a free estimate and a realistic timeline.
How do you source the Ameristar shell or parts? We source to the model and series on your plan set, and we confirm compatibility before ordering. Call (844) 797-6157 for a free estimate.
Written by the team at Mason Remodeling Enterprise, serving Enterprise and nearby areas.












