







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Unilock Home Additions & ADU: The Enterprise Owner’s Guide
We build Unilock-compatible home additions and ADUs in Enterprise, and most projects land between $45,000 and $130,000 installed, with ADUs running $90,000 to $220,000 (garage conversions $30,000 to $80,000). The “part” that fails here isn’t a spring or a motor – it’s usually the connection point where Unilock hardscape meets the new structure: pavers settling away from a footing, a base course that wasn’t compacted to spec, or a frost-free stem wall that was never formed for Nevada wind uplift.

Owners in Enterprise usually find out the hard way after the first monsoon season, when water pools against the new addition’s foundation, a paver apron heaves, or a wall course starts rocking underfoot. This page covers what the Unilock system actually is, which models and series apply, what fails first, and what honest replacement pricing looks like.
Key Takeaways
- Typical addition cost in Enterprise: $45,000 – $130,000 installed. ADUs: $90,000 – $220,000.
- Most failures trace back to base prep and drainage, not the paver or block itself.
- Every project gets a written price before any work starts.
- We’re an independent service provider – not affiliated with Unilock.
Which Unilock Models This Applies To

Unilock makes a family of hardscape products, not a single “part” – and that matters when you’re trying to match one to your project. The series most Enterprise homeowners ask about are Cambridge, Brussels Block, and Beacon Hill for paving; Brussels Dimensional Stone and the Legacy Collection for walls; and the retaining wall systems (Olde Quarry, for example) that hold grade on sloped lots around Anthem and Sunridge. Each series has its own modular length and thickness, which is what determines whether a new course will key into an existing one.
To identify a product, look for the interlocking shape and the stamped imprint on the underside or edge of the unit – Unilock blocks are typically marked. Measure a single unit’s face length and thickness; those two numbers narrow the series quickly. If your project involves extending a wall or apron, exact series matching matters because a Brussels Dimensional Stone course won’t interlock cleanly with a competing profile, and a visual mismatch shows for decades.
OEM-vs-aftermarket isn’t really the decision here. Unilock is the OEM. The honest choice is whether to match the exact series or to rebuild the whole apron or wall face in a fresh profile, which is often cheaper than hunting discontinued units. Call us with your measurements and we’ll tell you which route is realistic.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Unilock Home Additions & ADU Is Failing
Most of what we inspect in Enterprise isn’t a sudden break – it’s slow settling that owners only notice after a season or two. Here’s what to check:
- Water pooling against the foundation of the new addition. That means the paver apron or grade wasn’t sloped away from the wall at the required fall. Left alone, it pushes moisture into the stem wall.
- Paver courses rocking underfoot or “mushy” corners. The compacted base (usually 4 to 6 inches of aggregate depending on your soils here) wasn’t deep enough for Enterprise’s caliche-heavy ground, so the units move.
- Wall courses leaning out or separating at the joints. Retaining walls under 4 feet (about 48 inches) in Enterprise usually don’t require a stamped engineering design, but they still need proper batter and drainage – and a wall installed without weep points fails first at the base.
- Visible joint gaps or sand washout after a storm. That’s a sign the poly sand was installed too dry or onto a wet surface, which is one of the most common shortcuts in the desert.
- Heaving near the addition’s footing. Expansive soils and heat cycles torque the base; if the installer skipped geotextile fabric, settling happens within a year or two.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For Enterprise, an addition runs $45,000 – $130,000 installed, ADU construction $90,000 – $220,000, and a garage conversion $30,000 – $80,000. The hardscape and base work inside that number is what drives most of the range. What moves the price:
- Base prep. Deeper aggregate and geotextile fabric here cost more than shallow base, but they’re the reason the work holds.
- Drainage and slope. Correcting grade against an existing foundation adds real labor.
- Series matching. Rebuilding in a fresh Unilock profile is often cheaper than sourcing discontinued units.
- Permits and inspections. Pulled and passed as part of the project.
Every project gets a written, line-item price before any work starts – never a verbal estimate that grows on the final bill. Workmanship is backed by our 365-Day Done Right Promise, and we return free if an installation fails within that window. Call (844) 797-6157 for a free estimate.
DIY or Call Us?
What you can safely do yourself: measure a unit to identify the series, take clear photos of the base and any pooling, and lift a single loose paver to look at the aggregate underneath. That’s diagnostic, not structural, and it’s genuinely useful when you call.
Where DIY goes wrong: rebuilding a base course, resetting a retaining wall, or re-grading against a new addition’s footing. Those tasks involve the structural integrity of a wall that holds soil and the drainage that protects your foundation – get them wrong and the failure shows up in a season, often with water damage to the addition itself. A wall that’s already leaning is a genuine risk. Call us at (844) 797-6157 and we’ll walk the site; a live person answers every call, around the clock.
FAQs

A properly installed Unilock hardscape should last 20 to 30 years or more in Enterprise’s climate. The pavers themselves are durable; the base and drainage are what fail first, which is why we spec deeper aggregate and geotextile fabric on every addition.
Sometimes, yes – a single course or a small apron section can be lifted and reset if the base underneath is still sound. If the base has settled or drainage was never correct, repair is a patch that fails again. We’ll tell you which it is after a look.
For a typical addition’s hardscape and connection work, plan a few weeks depending on scope and inspection schedules. We give a written timeline with the price, so you know what you’re committing to before anything starts.
Our material partnerships include Unilock, so we can specify the exact series and profile when it’s available, or recommend a fresh profile when it’s not. That comes through our supplier network – we don’t carry stock, but we get the right units to your project. Call (844) 797-6157 for a free estimate; we’ll confirm availability and quote a written price. We also work alongside KraftMaid, Cambria, and Silestone when an addition touches cabinetry and surfaces.
Written by the team at Mason Remodeling Enterprise, serving Enterprise and nearby areas.












