







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Dvele Home Additions & ADU: The Enterprise Owner’s Guide
We install and finish Dvele-compatible home additions and ADUs in Enterprise, and a complete addition typically runs $45,000 – $130,000 installed, while a detached ADU runs $90,000 – $220,000 depending on size, foundation, and utility runs. These are planned builds, not emergency calls, so the real work starts with a site visit and a written scope, not a same-day dispatch. Homeowners usually discover the problem the same way: the addition was framed and closed but never finished to spec, the roof tie-in leaks after a monsoon, or the ADU slab and utilities were roughed in and then the original contractor disappeared. We pick up from there, verify what’s actually built, and give you a written price before any tool comes out.

To be clear about who we are: Mason Remodeling Enterprise is an independent service provider and is not affiliated with Dvele. We work with Dvele-built structures and finish them to a standard that holds up in Southern Nevada.
Key Takeaways
- Dvele-compatible additions in Enterprise typically cost $45,000 – $130,000; detached ADUs run $90,000 – $220,000.
- Most failed projects we see were never completed to close-out: missing tie-ins, unfinished utility connections, or a roof that doesn’t shed water.
- We verify what’s built before pricing anything, so you’re not paying twice for the same wall.
- Every project gets a written price before work starts and a written guarantee with stated terms for 365 days from the completion date.
Which Dvele Models This Applies To

Dvele builds panelized, factory-assembled homes in a few model families, and the finish-out details differ between them. The panel joints, roof pitch, and utility chase locations aren’t identical across lines, so the first thing we do on any Enterprise site visit is confirm exactly which Dvele model and panel set we’re working with. That determines how an addition ties into the existing structure, where the foundation loads land, and how the roofline meets without creating a leak point.
You can usually find the model and panel identification on the data plate inside the mechanical closet or on the panel stamps near the utility wall. If those aren’t visible, the stamped plans and panel schedule are the reliable source. Bring those to the first call and we can talk specifics instead of guesses.
On the OEM-versus-aftermarket question: for the structural and weather-tight parts of a Dvele finish-out (panel connections, roof tie-ins, flashing), we use manufacturer-specified or equivalent components, not whatever’s cheapest at the supply house. For interior finishes, you have room to choose. We work with cabinet lines like KraftMaid, and surfaces from Cambria and Silestone, when the addition includes a kitchen or bath. The decision to go OEM on structural parts isn’t a sales pitch; it’s what keeps the tie-in watertight through the wet season and the dry heat that follows.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Dvele Home Additions & ADU Is Failing
An addition or ADU doesn’t fail all at once. It shows a set of symptoms, and most trace back to the same handful of causes. Here’s what we see on Enterprise projects:
- Water intrusion at the roof tie-in. Where the new roof meets the original Dvele roof, the flashing and transition are the weakest point. If it was never correctly layered, you’ll see staining on the ceiling after the first real rain, and in Enterprise that often means monsoon season.
- Cracks radiating from the addition joint. A hairline crack at the seam between existing and new walls can mean the foundation loads weren’t tied together properly, or the slab settled unevenly. Enterprise’s expansive clay soils move with the moisture cycle, and a poor foundation connection makes it worse.
- Doors and windows that won’t close flush. Binding in an addition’s openings often points to framing that shifted after the build, or a wall that’s out of plumb. Left alone, it stresses the glass and the frame.
- Cold or hot spots and drafts. An ADU or addition with gaps in the insulation envelope or unfinished penetrations will never hold temperature. In Enterprise summers, that shows up fast on the power bill.
- Exposed or unfinished utility connections. We regularly find additions where the electrical or plumbing was roughed in and never brought to final. That’s a code and safety issue, not just a cosmetic one, and it’s often why a project stalled in the first place.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Here’s what finishing or rebuilding Dvele-compatible additions and ADUs runs in Enterprise:
| Project | Installed price range |
|---|---|
| Home Addition (finish-out or rebuild) | $45,000 – $130,000 |
| Detached ADU Construction | $90,000 – $220,000 |
| Garage Conversion to living space | $30,000 – $80,000 |
What drives the range: square footage, foundation work, how much is already built and salvageable, utility distance from the main panel and sewer, and interior finish level. A finish-out of a framed addition sits near the low end; a full detached ADU with new slab, full kitchen and bath, and separate utility runs sits near the high end.
You get a written, line-item price before any work starts, with parts and labor separated so you can see where the money goes. Our technicians have up to 22 years of experience, and every project carries a written guarantee with the coverage terms stated plainly for 365 days from completion. If something we installed fails within that year, we come back at no charge.
DIY or Call Us?
Some things you can safely check yourself: photograph the roof tie-in from inside the attic, note where cracks appear and whether they’re growing, feel for drafts around openings, and confirm the model data plate so you know what you’re dealing with. That information makes the first call more productive.
Where DIY goes wrong is the structural and life-safety work. Foundation tie-ins, roof flashing, and utility connections are past the point where a homeowner should be climbing a ladder or opening a panel. Electrical work in particular can kill you, and a badly flashed tie-in looks fine until the first storm. This isn’t a job to guess at. We verify the structure, correct what’s unsafe, and finish it to spec, and we do it with a written price and a written guarantee behind it.
Call (844) 797-6157 to schedule a free estimate. A live person answers around the clock, and before any visit you’ll get the technician’s name and photo, with a photo ID badge at the door under The Threshold Standard.
FAQs

A properly built and finished Dvele addition should hold up for decades, but the weather-tight details are what decide it in Southern Nevada. Enterprise’s swing between dry heat and monsoon rain is hard on roof tie-ins and flashing, so an incompletely finished addition can start leaking within a couple of seasons. Get the tie-in right the first time and the structure lasts.
Often yes. Many projects we see in Enterprise are partly built and can be finished or corrected rather than torn down. Water intrusion, cracks, and binding openings are frequently fixable if the underlying framing and foundation are sound. We assess what’s there before recommending anything, so you’re not paying for a rebuild you don’t need. Call (844) 797-6157 for a free assessment.
A finish-out or correction on an existing addition usually takes a few weeks to a couple of months, while a full detached ADU in Enterprise runs several months because of foundation, utilities, and inspections. We give you a realistic schedule in the written scope, not a promise we can’t keep.
We use manufacturer-specified or equivalent components for the structural and weather-tight parts of the finish-out, and work with quality material lines for interiors. We don’t claim to stock Dvele parts or to carry them on a truck; when a specific component is needed we source it to spec and tell you the lead time. Call (844) 797-6157 for a free estimate and we’ll walk through what your project needs.
Written by the team at Mason Remodeling Enterprise, serving Enterprise and nearby areas.












