







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Oldcastle Kitchen Remodeling: The Enterprise Owner’s Guide
We install Oldcastle-compatible kitchen remodeling in Enterprise, and a typical full kitchen runs $14,000 – $45,000 installed. Smaller projects start lower: cabinet installation is $4,000 – $13,000, countertops $2,000 – $6,500, and a backsplash $800 – $2,500. Most Enterprise homeowners land on this page the same way: their Oldcastle kitchen’s finish has started to fail. Maybe the countertop edge chipped and the seam opened up. Maybe the cabinet doors no longer line up and the drawers drag more every month. Maybe the backsplash grout is cracking along a run of tile, or the sink has pulled loose from the counter. These are the five signs we get called about most, and none of them mean the room has to come out down to the studs.

Which Oldcastle Models This Applies To
Oldcastle covers a wide spread of kitchen products: wall block and masonry, hardscape, and the surface and cabinetry products that go into a kitchen build. The gotcha is that Oldcastle sells under several product lines that don’t share a trim palette. So a replacement counter edge or a matching cabinet door might be the right color and the wrong profile. Before you order anything, find the label on the back of the cabinet box or under the counter overhang. It’ll carry a series or product name, a size spec, and sometimes a color code. Take a photo of that label and measure the opening yourself. Counter depth and cabinet box widths read slightly different from the nominal size. For Oldcastle specifically, the OEM-versus-aftermarket call comes down to what failed: a cosmetic face can often be matched with quality aftermarket equivalents, while a structural piece or a discontinued series usually means a custom match. Mason Remodeling Enterprise is an independent installer, not affiliated with Oldcastle. We also work with KraftMaid, Cambria, and Silestone when a homeowner wants to change direction.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Oldcastle Kitchen Remodeling Is Failing
- Countertop seams opening or edges chipping. Usually movement in the substrate or an adhesive failure under the seam. In Enterprise’s dry desert air, a quartz or stone top can shift as the cabinets below it expand and contract with the seasons.
- Cabinet doors out of alignment, drawers dragging. The hinge or slide has loosened from the box, or the box itself has warped. Rarely a cosmetic issue. It usually traces back to a hinge plate that worked its way out of soft particleboard.
- Grout cracking along the backsplash. Heat and settling. A run of grout that cracks in a straight line usually means the tile or the substrate behind it is moving, not just that the grout dried out.
- Caulk lines failing at the sink or behind the range. Water has gotten behind the joint. This is the one we treat as urgent, because moisture under a counter edge is what turns a small repair into a cabinet replacement.
- Oldcastle surface fading or chalking. Sun exposure through an unshaded east or west window. Enterprise gets a lot of direct afternoon light, and some surface finishes show wear years before their rated life.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Here’s what that work runs in Enterprise, installed. Parts and labor are broken out on your written quote before anything starts, so you can see what the material costs versus what the install costs.
| Project | Installed range |
|---|---|
| Full kitchen remodel | $14,000 – $45,000 |
| Small kitchen remodel | $9,000 – $20,000 |
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
What moves you up or down that range: cabinet box count and whether the layout changes, whether you’re staying with Oldcastle or swapping brands, counter square footage and edge profile, and whether the plumbing or electrical has to move. A straight swap of failed parts sits at the low end. A layout change that adds an island or moves a range sits at the high end. Every project comes with a written price before work begins, and coverage is spelled out plainly: 365 days from the completion date, with a free return visit if an installation fails.
DIY or Call Us?
Some of this you can check yourself. Open and close every cabinet door and watch where it binds. Look under the sink for soft wood or dark staining. Press on the counter edge and see if it flexes. Photograph the labels so you have the specs. That’s diagnosis, and it helps us quote accurately.

Where DIY goes wrong is installation. Setting a countertop or rehanging a full run of cabinet doors is a two-person job with no tolerance for a bad measurement. A counter that isn’t level cracks at the seam within a season, and a backsplash set over a moving substrate takes the grout with it. There’s no high-tension or gas danger in most of this work, but there is a real cost to getting it wrong once. Call (844) 797-6157 and we’ll tell you honestly whether your job is a repair or a replacement. Estimates are free.
FAQs

Most Oldcastle kitchen surfaces hold up 10 to 15 years in a well-ventilated Enterprise kitchen, less on east or west walls that take direct afternoon sun. Shade the glass and the finish lasts closer to the top of that range. Call (844) 797-6157 for a free estimate on replacement.
Often yes. A single cabinet door, one loose hinge run, or a short grout line can usually be repaired without touching the rest of the kitchen. Repairs make sense when the substrate is sound and the failure is cosmetic. Once water has gotten into the cabinet box, replacement is the cheaper path. Call (844) 797-6157 and we’ll give you a straight answer.
A single-part swap like a backsplash or a set of cabinet doors usually takes one to two days. A countertop replacement runs two to four days once the material is in hand. A full kitchen remodel runs two to four weeks depending on cabinet lead time. You’ll get the schedule in writing with your quote.
We match from the label and measurements you send us, then confirm the profile against the Oldcastle series before ordering. If a series is discontinued, we tell you up front and quote the custom match or the closest current equivalent rather than guessing. Call (844) 797-6157 to start.
If your Oldcastle kitchen has a failed counter seam, a sagging cabinet run, or a backsplash that’s cracking along the grout, we can price the fix. Call (844) 797-6157 for a free estimate. You’ll get a written price before any work starts, a technician’s name and photo before the visit, and a live person on the phone whenever you call.
Written by the team at Mason Remodeling Enterprise, serving Enterprise and nearby areas.












